Jun 251 min readOdessa Groundwater replacement project moves forwardUpdated: Jun 29July 25, 2024The Odessa Groundwater Replacement project moved forward as the first fused joint of the 24” HDPE Pipe on the EL 86.4 A line was completed Tuesday, June 25. Line completed to 100 feet.
July 25, 2024The Odessa Groundwater Replacement project moved forward as the first fused joint of the 24” HDPE Pipe on the EL 86.4 A line was completed Tuesday, June 25. Line completed to 100 feet.
OneEnergy invites community to learn more about proposed Solar FarmOctober 31, 2024 updated Nov 14, 2024 By: FCG Staff OneEnergy invites the North Franklin community to a public meeting to discuss plans...
School threat determined "just rumors"November 6, 2024 By: Katherine Trowbridge Earlier today, the Franklin County Graphic covered a report of a social media post by a student...
Threat reported by NFSD at OJHNovember 6, 2024 By: FCG Staff The North Franklin School District has been joined by Connell Police today in seeking the cause of an...
Comments